2025 in Review: Project Highlights 🏢

This year we delivered impactful projects, strengthened partnerships, and advanced sustainability, reflecting our commitment to innovation and growth. Thank you to our team and partners for making 2025 a success. Here’s to an even stronger 2026!


For the expansion project at United Christian Hospital, Promat's products are being used extensively:

1. 4-Hour Integrity and Insulation Duct Cladding: This involves over 26,000 m² of duct cladding, providing robust fire protection and thermal insulation.
2. 2-Hour Integrity and Insulation Access Panel System: This system covers over 1,500 m², ensuring safe and efficient access while maintaining fire resistance and insulation.

These materials are crucial for enhancing the hospital's safety and energy efficiency, contributing to a secure and comfortable environment for patients and staff.

Learn more about Promat


Product Installed:

  • 2 nos. of Windcatcher X-air 170 System (South face) Pitched Roof

  • 2 nos. of Windcatcher X-air 140 System (North face) Flat Roof

The Kai Tak Sports Park is Hong Kong’s largest sports infrastructure development, designed to be a world-class destination for sports, entertainment, and community engagement. Located on the former Kai Tak Airport site, the 28-hectare complex includes a 50,000-seat main stadium, a 10,000-seat indoor arena, a 5,000-seat sports ground, and extensive retail and leisure facilities.

As part of its commitment to sustainability and environmental innovation, the project incorporates the Monodraught Windcatcher natural ventilation system, supplied and supported by Delta Pyramax, the exclusive distributor of Monodraught in Hong Kong.

Monodraught Windcatcher – Sustainable Ventilation Solution

The Windcatcher is a passive ventilation system that captures and distributes fresh air throughout indoor spaces without the use of mechanical fans. In the Kai Tak Sports Park, Windcatchers are strategically integrated to:

  • Enhance natural airflow and thermal comfort in selected public and semi-enclosed areas

  • Reduce energy consumption by minimizing reliance on mechanical ventilation

  • Support the project’s green building and ESG objectives

By utilizing Windcatcher technology, the Kai Tak Sports Park sets a benchmark for sustainable design in large-scale public infrastructure, aligning with Hong Kong’s vision for a low-carbon future.

Learn more about Windcatcher


Hotel Lisboa in Macau renovated their West Wing suites area; to catch up progress and solve labour shortage Hotel Lisboa decided to use “Press-fitting technique” to connect water pipes in suites area with over 400 hotel rooms.

We offered Viega’s fittings to them, Viega has over 2000 types of fittings, which can fulfil most client needs.

By using Viega’s Copper tube fittings, there is no soldering needed. We can simply “press” the fittings with copper tube by using Viega’s Press-gun for 4 to 5 seconds.

After pressing, Viega’s fittings have working pressure up to 16 bar and can be used with temperature range -5°C to 110°C.

澳門葡京酒店西翼的客房區正在進行翻新工作,為了追趕工程進度及解決人手不足的問題,酒店方決定使用「卡壓式」夾喉配件來處理400間客房的水喉接駁問題。

Viega配件款式多達2000種,能滿足大多數客人需求。

Viega銅喉配件無須燒焊,只需用專用卡壓槍卡壓4~5秒即可。
經Viega配件接駁後工作壓力可達16 bar工作溫度為 -5°C 至 110°C

Learn more about viega


Curtain-type Fire Dampers use less energy than local fire dampers because their simple design improves airflow and reduces power use. The photos show our work at Shatin Plaza, where a 6-module Curtain-type Fire Damper sized 3500(W) x 1500(H) replaced the old ones. This upgrade eliminated the need for energy-saving louvers and lowered operating costs.

Learn more about Fire Damper

Previous
Previous

2025 Holiday Hours 🎄

Next
Next

2025 in Review: Exhibitions 🤝